  VesselÀÇ Ventilation°ú Vent
  ±Û¾´ÀÌ : ¿µ¿£Áø   °íÀ¯ID : show1130     ³¯Â¥ : 16-03-29 14:57     Á¶È¸ : 4709    
   vent.JPG (8.8K), Down : 35, 2016-03-29 14:57:41
¾È³çÇϼ¼¿ä. Process Engineerȸ»ç¿¡ ´Ù´Ï´Â Ãʺ¸ ¿£Áö´Ï¾î ÀÔ´Ï´Ù.
ÇÁ·ÎÁ§Æ® ¼öÇàÁß¿¡ ±Ã±ÝÇÑ °ÍÀÌ »ý°Ü¼­ ¼±¹è´ÔµéÀÇ ÀÇ°ß µè°íÀÚ Áú¹®µå¸³´Ï´Ù.
 
ÇÁ·ÎÁ§Æ® ¼öÇàÁß Vessel¿¡ 6in Ventilation nozzle¿¡ ¹Ù·Î ¿¬°áµÇ¾î 2in Vent nozzleÀÌ ¿¬°áµÇ¾î ÀÖ´Â °ÍÀÌ ÀÖ½À´Ï´Ù. (÷ºÎ±×¸² ÂüÁ¶)
Design basis»ó¿¡ Vessel Tangent / Tangent Length°¡ 6mÀÌÇÏÀ̸é 6in Ventilation nozzleÀ» ¼³Ä¡.
±×¸®°í Vessel volumeÀÌ 80m3ÀÌÇÏÀ̸é 2in Vent¼³Ä¡Ç϶ó°í SpecÀÌ ÀÖ½À´Ï´Ù.
 
¿©±â¼­ ±Ã±ÝÇÑ°ÍÀº ´Ü¼øÈ÷ Spec¿¡ ÀÇÇؼ­ ÀÌ·¯ÇÑ ¼³Ä¡°¡ µÇ¾îÁö´Â °ÍÀÎÁö. ¾Æ´Ï¸é °øÁ¤or±â°èÀûÀ¸·Î ÀåÁ¡ÀÌ ÀÖ´Â °ÍÀÎÁö ±Ã±ÝÇÕ´Ï´Ù. ÀúÀÇ ¼Ò°ßÀ¸·Î´Â 6in Ventilation nozzle¸¸ ÀÖÀ»°æ¿ì 2inº¸´Ù Vent°¡ ´õ ÀߵǰÚÁö¸¸ ±× À§¿¡ 2in Vent nozzleÀ» ¿¬°áÇÏ¸é °á±¹ 2in Å©±â·Î VentµÇ´Â °ÍÀ̶ó°í »ý°¢µÇ´Âµ¥¿ä.. ±×·³ 2in Vent¸¸ ¿¬°áÇÑ °Í°ú °°Àº°Í ¾Æ´Ñ°¡...¶ó°í »ý°¢ÇÕ´Ï´Ù.
 
°øÁ¤»ó Å« ¹®Á¦´Â ¾Æ´Ñ°Í °°Áö¸¸...¿Ö±×·±Áö ±Ã±ÝÇؼ­. ¼±¹è´ÔµéÀÇ Áö½Ä °øÀ¯ ºÎŹ µå¸±°Ô¿ä~

½ºÅ×Æijë Stefano   16-03-29 15:53
(1) <Design basis»ó¿¡ Vessel Tangent / Tangent Length°¡ 6mÀÌÇÏÀ̸é 6in Ventilation nozzleÀ» ¼³Ä¡.
±×¸®°í Vessel volumeÀÌ 80m3ÀÌÇÏÀ̸é 2in Vent¼³Ä¡Ç϶ó°í SpecÀÌ ÀÖ½À´Ï´Ù.>

À̺κÐÀÌ Á» ÀÌ»óÇÕ´Ï´Ù ¿ø¹®À» Âü°íÇÏ¿© È®ÀÎÇØ º¸¼¼¿ä. T-T±æÀÌ 6m ÀÌÇÏ Á÷°æÀÎ ¿ë±â¶ó¸é  200 m3 ÀÌÇÏÀÇ ÅÊÅ©Àε¥ ¾ÆÁÖ ÀÛÀº ÅÊÅ© ¿¹¸¦ µé¾î Á÷°æ, T-T±æÀÌ °¢°¢ 1 mÀÎ ÅÊÅ©¿¡µµ 6" ³ëÁñÀ» ºÙÀ̶ó´Â À̾߱âÀÎÁö?  80m3 ÀÌÇÏÀ̹ǷΠ2"³ëÁñÀ» ºÙÀ̶ó´Â À̾߱âÀÎÁö..    SpecÀÌ À߸øµÇ¾î ÀÖ½À´Ï´Ù.

(2) VesselÀÇ Vent NozzleÀÇ Å©±â´Â Vessel¿¡¼­ÀÇ Vent (ȤÀº Vacuum Breaking)À» À§ÇÑ GasÀÇ È帧¿¡ ¹ÙÅÁÀ» µÎ°í Size¸¦ °áÁ¤ÇØ¾ß ÇÏ°í ±¸Ã¼Àû Gas À¯·®ÀÌ Á¤ÇØÁöÁö ¾ÊÀº °æ¿ì "Typical Size"¸¦ Á¤ÇÏ¿© Technical SpecÀ¸·Î Á¤¸®Çؼ­ Àû¿ëÇϵµ·Ï ÇÒ ¼öµµ ÀÖ½À´Ï´Ù. 

Process Gas(Vacuum) Load°¡ ¾Ë·ÁÁ® ÀÖÀ¸¸é À̸¦ ±âÁØÀ¸·Î ÇÏ°í ±×·¸Áö ¾ÊÀ¸¸é ÀßµÈ(^^) Technical SpecÀ» µû¶óµµ·Ï Çϼ¼¿ä.  Ä¿´Ù¶õ Nozzle¿¡ ÀÛÀº Header Size´Â  °³¹Ì ¹ß¿¡ ±¸µÎ ½Å±ä °ÝÀÌ µÇ´Â °Í°ú ¸¶Âù°¡ÁöÀÌÁö¿ä.
éÌÜó yongbong   16-03-30 16:27
¸»¾¸ÇϽŴë·Î °øÁ¤»ó Å« ¹®Á¦´Â ¾Æ´ÏÁö¸¸, ±»ÀÌ Àǹ̸¦ ºÎ¿©ÇÏÀÚ¸é ¾Æ·¡¿Í °°½À´Ï´Ù.

Vent NozzleÀº Valved OperationÀ¸·Î Steam OutÀ» ÇÏ´Â °æ¿ì µî¿¡ »ç¿ëµÇ´Â ÀÛÀº NozzleÀ̱¸¿ä,
Ventilation NozzleÀº Åë»ó ¾Æ·¡ÂÊ¿¡ Á¸ÀçÇÏ´Â Man Hole°ú È£ÀÀÇÏ¿© VentilationÀÌ Àß µÇµµ·Ï ¸¸´Â Nozzle·Î¼­ ÀÛ¾÷ÀÚ°¡
Vessel¿¡ µé¾î°¡±â Àü¿¡ Flange¸¦ ¿­¾î¼­ ¿ÂÀüÈ÷ 6" OpeningÀÌ µÇµµ·Ï ÇÕ´Ï´Ù.

¿¹Àü¿¡´Â ÀÌ·± ±¸ºÐÀ» µÎÁö ¾Ê¾Ò´Âµ¥, ¾î´À ¶§Àΰ¡ ºÎÅÍ ÀÌ·± ½ÄÀ¸·Î ¸¹ÀÌ ¼³Ä¡ÇÏ°í´Â ÇÑ ´ä´Ï´Ù.
ÀåÇö¼ö jddast   16-04-01 01:45
¾Æ·¡ ¹®±¸¿Í ºñ½ÁÇÑ ³»¿ëÀÌ ¾Æ´Ñ°¡¶ó°í ÆÇ´ÜÀÌ µË´Ï´Ù. ÀÌ °¡À̵å´Â ¸ðµÎ 12" ventilation holeÀ» °¡Áöµµ·Ï Áö½ÃÇÏ°í ÀÖ½À´Ï´Ù.

Process Containment Equipment to be lined/coated shall have sufficient size openings to permit air movement to keep solvent vapor to air ratio below lower explosive limits. Consideration shall be given to the number, size and location of manways used for the provision of air circulation equipment of lined items. These openings shall provide clear access for the ventilation, blastig hoses, air hoses, etc. They shall also provide clear access for the personnel to access / egress the vessel safely during prepartion of the vessel internal surface and application of the liner in case of an emergency situation. The following are minimum guidelines for the size and location of nozzles.

- API tank (< 6m dia) : 1 manway in the shell at grade and one 12" nozzle in the center of the roof
- API tak (>6m dia) : 2 manways in the shell at grade 180 degrees apart and one 24" nozzle in the center of the roof
- Horizontal vessel without an internal baffle : 1 manway in one head and one 12" nozzle in the center of the other head
- Horizontal vessel with an internal baffle : Same as above. The baffle shall have a removable section to be removed for ventilation.
- Vertical vessel : 1 manway in the shell a max 610mm from the bottom TL and one 12" nozzle in the center of the roof

Dia°¡ 1m ÀÌÇÏÀÇ ÀÛÀº drumÀº 8" ¶Ç´Â Body flange¸¦ Àû¿ëÇß½À´Ï´Ù.
½ºÅ×Æijë Stefano   16-04-02 11:28
ÀοëÇÑ ºÎºÐÀÇ Ventilation NozzleÀÇ °æ¿ì ³»ºÎ Lining ¶Ç´Â Coating ÀÛ¾÷ÀÌ ÇÊ¿äÇÑ Tank¿¡ ´ëÇØ ÇÊ¿äÇÑ È¯±â¿ë ³ëÁñÀ» ¾ð±ÞÇÏ°í Àִµ¥  API TankÀÇ Size ´ÜÀ§´Â 6'' °¡ ¾Æ´Ï°í 6m¶óµç°¡ 6'·Î º¸ÀÔ´Ï´Ù.  Ãâó¸¦ È®ÀÎÇØ ÁÖ¼¼¿ä/
½ºÅ×Æijë Stefano   16-04-02 11:28
ÀοëÇÑ ºÎºÐÀÇ Ventilation NozzleÀÇ °æ¿ì ³»ºÎ Lining ¶Ç´Â Coating ÀÛ¾÷ÀÌ ÇÊ¿äÇÑ Tank¿¡ ´ëÇØ ÇÊ¿äÇÑ È¯±â¿ë ³ëÁñÀ» ¾ð±ÞÇÏ°í Àִµ¥  API TankÀÇ Size ´ÜÀ§´Â 6'' °¡ ¾Æ´Ï°í 6m¶óµç°¡ 6'·Î º¸ÀÔ´Ï´Ù.  Ãâó¸¦ È®ÀÎÇØ ÁÖ¼¼¿ä/
ÀåÇö¼ö jddast   16-04-02 23:10
Á˼ÛÇÕ´Ï´Ù. API Tank size 6"°¡ ¾Æ´Ï°í 6mÀÔ´Ï´Ù. À§ ¿ø¹® ÀÚü¸¦ ¼öÁ¤ÇÏ°Ú½À´Ï´Ù. °¨»çÇÕ´Ï´Ù.
¿µ¿£Áø show1130   16-04-07 10:05
¼±¹è´ÔµéÀÇ Á¶¾ð ³Ê¹« °¨»çÇÕ´Ï´Ù.^^

Spec. ³ª¿Â °ÍÀ» Á»´õ ÀÚ¼¼È÷ ¼³¸í µå¸®ÀÚ¸é....
1.1 Size of Manhole
  6m smaller vessels, at least one manhole or one hand hole shall be provided. in this case, an air vent nozzle of 6" shall be installed at the extreme opposite of the manhole/hanhole.
éÌÜó ¼±¹è´ÔÀÌ ¸»¾¸ÇϽŠºÎºÐÀÎ µí ÇÕ´Ï´Ù.

1.2 Vent, drain size
    À§¿¡ ¸»¾¸µå¸° °Í°ú°°ÀÌ Vessel Volume¿¡ µû¶ó Vent size°¡ ³ª¿ÍÀÖ½À´Ï´Ù. 80m3 ÀÌÇÏ = 2" , 80~200m3 = 3" ....µî
ÀÌ·±½ÄÀ¸·Î µû·Î ¾ð±ÞµÇ¾î ÀÖ½À´Ï´Ù.

Á¦°¡ ±Ã±ÝÇÑ °ÍÀº Ventilation nozzle 6" À§¿¡ Vent nozzle 2"¸¦ ¼³Ä¡ÇÏ¸é °á±¹ 2" Å©±â¸¸Å­¸¸ È¿°ú°¡ ÀÖ´Â °ÍÀ̾ƴÑÁö¿ä.?
µÑÀ» µû·Î ¼³Ä¡ ÇØ¾ß ÇÏÁö´Â ¾Ê´ÂÁö¿ä?? 6" opening ½Ã¿¡´Â 2" Vent valve¸¦ ¶§°í »ç¿ëÇÏ´Â °ÍÀΰ¡¿ä.. Á¦°¡ ¾î¶²½ÄÀ¸·Î ¿¬°á µÇ´ÂÁö À߸ô¶ó¼­¿ä (ÇöÀåÀ» ¾È°¡ºÁ¼­..)

¼±¹è´ÔµéÀÇ Á¶¾ð ´Ù½ÃÇѹø ºÎŹµå¸³´Ï´Ù~
éÌÜó yongbong   16-04-08 10:25
¸Â½À´Ï´Ù. Ventilation NozzleÀ» Ventilation ¸ñÀû¿¡ ¸Â°Ô »ç¿ëÇÒ ¶§´Â À§ÀÇ Valve¸¦ Æ÷ÇÔÇؼ­ 6" Flange¸¦ Á¦°ÅÇÏ°Ô µË´Ï´Ù.
±×·¯¸é 6"¸¸Å­ÀÇ È¿°ú¸¦ º¸´Â °ÍÀÌÁö¿ä.

µµ¸éÀ» º¸½Ã¸é Flange´Â 6"ÀÓÀ» È®ÀÎÇÏ½Ç ¼ö ÀÖÀ» °Ì´Ï´Ù.
¸¸¾à µµ¸éÀÌ ºÒºÐ¸íÇϸé ÀÌ·±½ÄÀ¸·Î µÇµµ·Ï Note¸¦ ´Ù´Â °ÍÀÌ ¹Ù¶÷Á÷ÇÒÅÙµ¥, ¾Æ¸¶ ¹è°ü¿¡¼­µµ ÀÌ·¸°Ô ÀÌÇØÇÒ °Ì´Ï´Ù.
   